公众号.jpg     全国销售热线:800 820 2380
 24小时服务热线:400 820 2380  
阿里巴巴店铺CN
Home > Application > Railway Ship > Hohhot Railway Bureau
Railway Ship
Hohhot Railway Bureau

The Hohhot Railway Bureau was established on November 1, 1958. It is located in the central and western parts of the Inner Mongolia Autonomous Region. It is connected to the northwest, north and northeast regions of the Inner Mongolia Autonomous Region, and outside Mongolia, Russia and Eastern European countries. . Most of the lines in the pipeline are bordered by the Yinshan Mountains in the north and the Yellow River in the south, passing from west to east through the 2 leagues (Alxa, Xilin Gol) and 6 cities (Wuhai, Ordos, Bayannaoer, Baotou, Hohhot, Ulanqab) of the autonomous region. There are 15 holding joint venture companies including Jitong, Baoxi, Lince, and Haigong, and 3 joint venture companies including Huzhun, Dongwu and Sunite. There are 5 main lines of Beijing-Baotou, Baolan, Jier, Jitong and Baoxi lines, and 6 branch lines of Wuji, Haigong, Baobai, Baoshi, Baohuan, and Guocha.


   

The overall operating mileage is 4,457 kilometers, including 1625.6 kilometers of electrified railways; the original value of fixed assets is 46.66 billion yuan, and the net value is 36.84 billion yuan; the overall situation is 4645 days without railway traffic accidents above general Class A.

 

The total extension of the lines within the management of Hohhot Railway Administration is 3,801.675 kilometers, of which 2,540 kilometers are on the standard-gauge main line and 5.3 kilometers on the wide-gauge main line. The dual-line length is 902.4 kilometers, the operating mileage is 1630.6 kilometers, and all diesel locomotives are towed. There are a total of 4049 sets of turnouts, including 1352 sets of quasi-track main line turnouts and 104 sets of wide-gauge line turnouts. The length of the bridge is 1,451 and 38,138 meters. There are 9 tunnels with an extension of 3937 meters, and 1423 culverts with an extension of 30755 meters.

 

There are 133 stations, including 8 first-class stations and 6 second-class stations. There are 545 locomotives, including 495 diesel locomotives and 51 steam locomotives. There are 1192 passenger cars, including 346 hard-seater cars, 456 hard-sleepers, 97 soft-sleepers, 49 dining cars, 4 soft-seat cars, 28 double-decker buses, and 29 generator cars.

 

The total signal equipment is 1641.4 kilometers, including 883 kilometers for double tracks; 75 centralized relay stations and 59 computer interlocking stations; 6 hump marshalling yards, with 488.9 kilometers of automatic blocking and 1,154 kilometers of semi-automatic blocking; 202 integrated locomotive signals, universal There are 318 locomotive signals and 18 crossing signals; 3602 sets of interlocking turnouts, 254 sets of non-interlocking turnouts, and 45196 sets of global equipment conversion turnouts. Fixed assets of 112,220,35 million yuan.

 

The company started to use two SRC-30SA (flow 4.07m³/min, pressure 0.8MPa, voltage 380V) air compressors from Shanghai Schneider Sunshine in 2009, which are mainly used for instrument gas in the power section.

网页聊天